Stick Curtain Wall Design Issues Part 1

Welcome to the quiz on "Stick Curtain Wall Design Issues Part 1". You may try as many times as you want. Once you score 50% or more, we will issue your CPD certificate via email.

Which European standard includes the requirements of Curtain Walling Product Standard?

What should be placed between an aluminium bracket and concrete substrate in a wet zone?

In accordance with Approved Document Part B, what should be provided around a curtain wall opening, when it interfaces with a rainscreen façade?

What should be provided between a curtain wall and a compartment floor slab in order to mitigate the risk of fire propagation in the event of a fire?

An internal vapour control layer should be installed continuously and bonded against the framing, in order to mitigate the risk of ___________ condensation and improve the ________ tightness of the wall build-up.

Leave a Reply

Your email address will not be published. Required fields are marked *

error: Content is protected !!